DAILY ENTRIES
2/11/10- It's been El Camino all day, every day. I really hate this car at this point. Pure loathing. Every step forward is a step back, but I think I can see the light at the end of the tunnel.
1/18/10- got the cases apart on the '63. Now to deal with the flywheels.
1/4/10- 2 bikes off to paint and almost powder (still have to sep a set of spoked wheels. Now I have a car to finish and transmission work to do).
12/27/09- OUCH. Decided to go for a ride today since the weather broke. And forgot to retard the magneto when I hit the key. My expensive 65-69 inner primary............. No one to blame but myself though
12/20/09-Finally getting some work done again after moving house and garage (almost done). Straightened a bent OEM 58-72 swingarm with some heat and muscle. Fired up the new TIG using new wiring in the new garage and did the the pipes and bars.
12/13/09- Crash course in electrical. Wiring two 220v circuits in garage for TIG and Air compressor. This is the panel originally: 80 amp subpanel fed by 6ga. Ran 10-3 and 6-3 for the TIG and compressor, respectively, then redid the panel.
8/28/09- Just looking through some old photos and these were from my pre getting married trip down the mid-atlantic coast and up the Blue Ridge, almost 1700mi.
7/31/09- w/ all bikes done, I'm finally working on the El Camino, eventhough i don't want to. Bedliner and new stainless.
3/31/09- Good head! Thanks Zippers
3/29/09- I loathe spiral lock wrist pin clips
3/21/09- More fun
3/20/09- last parts from paint and powder arrive
3/19/09- i hate internal throttles
3/18/09-starting to look like a bike. And I got the power cross feed on my South Bend 9" A working.
3/15/09- I hate mounting tires, especially on freshly powdercoated wheels.
3/14/09- Fun with stainless
3/13/09- Picked up 90% of the powder coat, the ceramicoated exhaust, and 66% of the paint. The paint is what I expected but not what I'd hoped for from a guy from a local body shop painting on the side. I'm excited to see this thing done though. Oh well. Bearings in the wheels and spoked one wheel.
3/12/09- Bearings installed in the drums
3/10/09- '69 trans ready to go. Front brake drum sand blasted and painted.
3/6/09
Took the night off for

and

and

. But tomorrow's a new day w/ lots of plans.
3/5/09
Got the bottom end buttoned up finally. Everything cleaned up, new gaskets everywhere, inspections, reassembly. Cam chest and magneto timed. Rockers are done. So now I'm just waiting for Cylinders, Pistons and Heads back from the shop. Brakes purged and ready for DOT5. New left side handlebar cut.